Kindl Brewery – Centre for Contemporary Art

STRUCTURAL FACADE DESIGN, CONCEPT TO DETAILED DESIGN

Berlin 2016 – 2017
Architect: grisard´architektur, Zurich
Photo: Stefan Melchior


The Kindl brewery in Berlin-Neukölln, which has been closed down for many years, has been re-designed and built as a centre for contemporary art. The supporting structure for the façade of the wind screen consists of rectangular multi-chamber hollow profiles. The system used here is Schüco Steel-Jansen VISS. In the area of the staircase a frameless glazing with point-fixings according to Fischer Zykon system with a general approval by the building authorities has been applied.

Prora, Block 1, Island of Rugen, Germany

ProraBlock1_01

APPROVAL PLANNING TO CONSTRUCTIONAL SUPERVISION

Island of Rugen / Germany 2013 – 2016
Client: Wohnen in Prora, Vermögensverwaltungs
GmbH & Co. KG, Berlin / Germany
Architect: Stuke Architekten GmbH, Berlin /
Germany
Photo: Wohnen in Prora Vermögensverwaltungs
GmbH & Co. KG, Berlin / Germany


The structural intervention in a listed building can be regarded as a special challenge at all times. “Block 1“ of Prora, belonging to the former Third Reich Holiday Resort, is no exception to this rule. It has been converted into modern style apartments and a hotel. Continue reading

Drake Street, Berlin, Germany

DrakestrasseBerlin_02

CONCEPTUAL DESIGN TO APPROVAL PLANNING

Berlin / Germany 2014 – 2015
Client: BOTAG-Fonds 20 Drakestr. 76 / 77 GbR,
Berlin / Germany
Architect: Stuke Architekten GmbH,
Berlin / Germany
Photo: Stuke Architekten GmbH, Berlin / Germany


The flat roof of the six storey housing block in the Berlin suburb Lichterfelde had to be thermally insulated. As the building retrofit progressed it was decided
to put a penthouse consisting of 12 units with an approx. 1.100 m² of living area on top. As the building had been built in prefabricated reinforced concrete sections that could not take too much additional load the new penthouses were mainly constructed out of prefabricated solid timber elements. The special structural challenge lay in the alignment of the construction methods between the existing building and the new penthouses.