{"id":161,"date":"2010-01-01T02:04:54","date_gmt":"2010-01-01T01:04:54","guid":{"rendered":"https:\/\/www.patrick-teuffel.eu\/wp\/?p=161"},"modified":"2017-03-28T11:53:26","modified_gmt":"2017-03-28T09:53:26","slug":"studentenwohnheim-mit-kita-campus-nord-in-kassel","status":"publish","type":"post","link":"https:\/\/www.patrick-teuffel.eu\/en\/studentenwohnheim-mit-kita-campus-nord-in-kassel\/","title":{"rendered":"Student Accommodation with day-care, Kassel, Germany"},"content":{"rendered":"<p><\/p>\n<h4>CONCEPTUAL DESIGN TO TENDER DOCUMENTS<\/h4>\n<p><em>Kassel \/ Germany 2012 \u2013 2014<\/em><br \/>\n<em>Client: Studentenwerk Kassel, Kassel \/ Germany<\/em><br \/>\n<em>Architect: berger r\u00f6cker architekten,<\/em> <em>Stuttgart \/ Germany<\/em><br \/>\n<em>Photo: berger r\u00f6cker architekten,<\/em> <em>Stuttgart \/ Germany<\/em><\/p>\n<hr \/>\n<p>The project was commissioned by the Student Organization for the newly designed University of Kassel campus. It turned out to be a comprehensive student accommodation with 150 living units. The major task was to find an economical construction method for a building which contains a most diverse mix of use<!--more--> \u2013 housing, offices and a day-care centre for young children. The preferred choice was a combined structure made of in-situ reinforced concrete and pre-fabricated concrete elements. Because of the difficult geological conditions the engineers opted for bore piles instead of conventional foundation.<br \/>\n<\/p>","protected":false},"excerpt":{"rendered":"<p>CONCEPTUAL DESIGN TO TENDER DOCUMENTS Kassel \/ Germany 2012 \u2013 2014 Client: Studentenwerk Kassel, Kassel \/ Germany Architect: berger r\u00f6cker architekten, Stuttgart \/ Germany Photo: berger r\u00f6cker architekten, Stuttgart \/ Germany The project was commissioned by the Student Organization for the newly designed University of Kassel campus. It turned out to be a comprehensive student [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":60,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,16,24],"tags":[],"class_list":["post-161","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buildings","category-tragwerksplanung","category-wettbewerbe"],"_links":{"self":[{"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/posts\/161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/comments?post=161"}],"version-history":[{"count":10,"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/posts\/161\/revisions"}],"predecessor-version":[{"id":1162,"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/posts\/161\/revisions\/1162"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/media\/60"}],"wp:attachment":[{"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/media?parent=161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/categories?post=161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.patrick-teuffel.eu\/en\/wp-json\/wp\/v2\/tags?post=161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}